Microsoft Project Templates: Construction Iteration
The generic project plan (at the workflow detail level) used
for the illustration of a Construction
Iteration in the description of Phases
may be found at:
Project Plan Template
(Workflow Detail Level) for MicrosoftProject98.
A more detailed plan, which goes to the activity level, may be
found at:
Project Plan
Template (Activity Level) for MicrosoftProject98.
This template is provided by courtesy of Ensemble Systems Inc.
These plans have
the tasks hyperlinked to the corresponding Rational Unified Process (RUP) activity. By
default, the hyperlink base in the files assumes that the RUP will be installed at: C:\Program
Files\Rational\RationalUnifiedProcess\ If you install the RUP elsewhere, then you must change the base directory in
each of the Microsoft Project files for the hyperlinks to work. Do this by
opening the project file with Microsoft Project, then under
File|Properties|Summary tab|Hyperlink base, enter the directory you are using
for installation of the RUP.
www.ensemble-systems.com
|